@niranjana-JIX4au
•
Oct 24, 2024
Oct 24, 2024
1.3K
Lai Chi Kok Drainage Tunnel - Main Tunnel Breakthrough
The contract to design and construct the Lai Chi Kok Transfer Scheme was won by Leighton Asia and the construction work began in November, 2008. The breakthrough of this branch...