Faliure of Drilled Tube wells in very short period

It is expected that in Jharkhand 15 to 30% Drilled tube wells silted or collapsed in 2 to 3 years and get choked, here UPVC casing pipes are used, it may be due to damage of UPVC casing pipe during insertion in loose formation or non insertion the casing pipe up to 15cm in rock, Or some other reason?

Replies

You are reading an archived discussion.

Related Posts

Guys the topics as suggested in the thread https://www.crazyengineers.com/community/threads/weekly-tech-discussion-topic-suggestion.60259/ And other topics which received second maximum votes in the previous Weekly discussion topic selection threads are all taken for this...
Why grouping in k-map is done in terms of 2 to the power of n?
Hi All friends...I want a new Idea on "data mining" to complete my thesis work..Thanks in advanced plz help
What is practical difference between uni-flow scavenging and loop scavenging..???
I Want to be master in designing. Glad to be a part of CrazyEngineers.