@senthamizhsolai s s • 10 Mar, 2015 • 1 like
Project Abstract / Summary : The 60% of accidents in railways are due to track problems which lead to derailment. This project presents the system for automatic crack detection in railway tracks. This project can help to detect the cracks or breakages in railway tracks if any before the train passes and the alert signal is sent to the train operator and the power line is tripped off immediately. The automatic crack detection system is constructed using vibration sensors and MEMS technology. Vibration sensor is used to detect the crack which has speed response to vibrations. MEMS are used to detect the track deviations and dislocations. MEMS is Micro Electro Mechanical System that combines electrical and mechanical components.In this project MEMS are used to check the status of the railway tracks and RF modules are used to transmit and receive the signal. PIC micro controller is used to compare the input signals with threshold value at transmitter side. MMIC (Monolithic Microwave Integrated Circuit) is used for continuous monitoring of MEMS. This project is cost effective and simple.

Why did you choose to work on this project topic : The 60% of accidents in railways are due to track problems which lead to derailment.Derailment problem often result in loss of human lives and damage to property. To prevent such kind of accidents we chose to work on this project topic.

Project Category : Electrical / Electronics / Communication
------------------------------------------------------
Institute/College Name: Easwari Engineering College
City: Chennai
State: Tamilnadu
Participating Team From: Final Year
@shafi ca • 30 Oct, 2016 Any detiled report of these project
@Shashank Kharade • 26 Jul, 2018 • 1 like

Please share some more information like components, circuit diagram, source code, etc

@Ramani Aswath • 26 Jul, 2018

What is the mechanism of detection? The track is constructed from discrete lengths of rails. Does it mean that there will be a sensor for each piece of rail? If so considering the total track length of Indian railways millions of sensors will be needed along with associated electronics and their power supply.

Or am I missing something important?

Related Posts

I thought of compiling a list of the coolest and the best whatsapp group names that you've been using for your respective groups. For the sake of convenience, we'll stick...
A simple good bye email or last working day mail ain't cool! We've some awesome templates that you can use. If you're looking for an amazing Last Working Day email...
Hello CEans, How to convert CGPA (10 Point Scale) to Percentage? Please help!
I heard many students are having a trouble registering on the TCS Portal, when it's quite straightforward actually. If you have problem in attaching photos or CV, Use internet explorer...
What is IES or Indian Engineering Services Exam? Union Public Services Commission (UPSC) conducts the Engineering Services Exam or ESE 2016 is an entrance exam for graduates who wish to...