Ravi Agarwal
Member
- Member since
- Jun 1, 2013
- Last active
- Jun 2, 2013
- Total activities
- 0
Activity feed
Recent contributions
-
#Threads
b888e875-0313-42a1-b7b9-0f232f3bb89f
Proper compaction of soil has been planned. If required, filling of the base may also be done. Should settlement still remain an...
-
#Threads
01b1ad9a-5410-4dfa-9ffb-38a92fe8b6c5
Considering that the depth of the Raft foundation is being planned to be kept low(2.5 metres) and seeing that uplift pressure wont...
-
#Threads
Raft Foundation in a construction site near a River.
We have a construction site with clayey soil for a very large depth(20 mts.) near a river where a G+7 structure is...