What can be controlled using SCADA @ Load Dispatch Center?

I have been to load dispatch center recently. There they monitor everything using scada. Whether it is possible to control using scada. For example. To trip a coil?

Replies

  • Harshad Italiya
    Harshad Italiya
    They might be using SCADA for some parameter monitoring and it can also generate signal which can be used to trip coils.
  • aarthivg
    aarthivg
    godfather
    They might be using SCADA for some parameter monitoring and it can also generate signal which can be used to trip coils.
    When I questioned the employee over there(load dispatch center), he said we are doing only monitoring, not controlling. Why its so? In scada technique , we cannot control ah?
  • Harshad Italiya
    Harshad Italiya
    Don't know about their exact application but i think you can control any devices.
  • aarthivg
    aarthivg
    godfather
    Don't know about their exact application but i think you can control any devices.
    It was said using Scada they cant control , it is used only for monitoring purpose.
    Anyway thanks.😀
  • Shreyas Sule
    Shreyas Sule
    SCADA essentially means Supervisory Control and Data Acquisition. In practice, different parameters can be controlled through hardware (PLC,relays,etc) or software (SCADA). SCADA can be used to trip a coil, although forcibly, or even to set some parameters for different logic groups in the schema. And the beauty of it is that all this can be done in real time. Although great care is needed while changing the parameters using SCADA as the logic applied through software can result in some unexpected changes in hardware.
    For eg, great care is to be taken while starting motors etc via SCADA as the contactors can remain in forced on position even if it is not energized after forcing them off via SCADA. In the load dispatch center the guys were just monitoring, it may possible that some parameters were initialized during the first run off of the process. During that "first run", those parameters may have been set. So essentially they were actually controlling them in the first place.
  • chiru
    chiru
    Using SCADA, we can control data in real-time while monitoring the load but there their employee necessity might be only to monitor the data.

You are reading an archived discussion.

Related Posts

Can any one give any details about the employment training program of Oracle for freshers? What we can expect during this training period and is will it be very difficult...
Earning money is the dream of everybody.If you want to earn money but do not want to invest a single penny then this post can be very useful. So How...
Concevior 2012 is an Archi Fest organized by MNIT Jaipur. It is the architecture segment of Primavera '12, the annual national level techno cultural fest of MNIT, Jaipur. It provides...
WHEN A LIZARD CAN, WHY CAN'T WE?​ ​​ This is a TRUE STORY that happened in Japan . In order to renovate the house, someone in Japan breaks open the...
Awesome 25th Marriage Anniversary!​ ​​ ​Once upon a time a married couple celebrated their 25th marriage anniversary. They had become famous in the city for not having a single conflict...