Project on design of bridge and quantity estimation

we have a span of 2 months .we want to do the project on design of bridge and quantity estimation.

is that time is enough to complete our task as a btech project????

Veellu kaadhu.

Two months span is too small. Maybe if the span of the bridge is also small you may have a go at it.

If it’s a small stream and the shores are rock, you can design a single prefabricated foot bridge that can be lowered into position by a crane. Not much foundation may be needed if the base is rocky.

@CIVILPRINCESS  would perhaps have a much better take on this.

thQ sir

@Ramani Aswath

can u suggest me any innovative project topics sir. 

Civil Engineering is not my area.

Is this just a design only project or is some experiments are expected to be done? There must be some staff supervising b tech level projects. Have they not given any suggestions?

Probably you can look at a low cost modular temporary housing (single room even) for disaster rehabilitation.

Please come back on what is expected from the project.