  • Project on design of bridge and quantity estimation

    Updated: Oct 26, 2024
    Views: 1.2K

    we have a span of 2 months .we want to do the project on design of bridge and quantity estimation.

    is that time is enough to complete our task as a btech project????

    0
    Replies
Howdy guest!
Dear guest, you must be logged-in to participate on CrazyEngineers. We would love to have you as a member of our community. Consider creating an account or login.
Replies
  • Ramani Aswath

    MemberNov 23, 2018

    Veellu kaadhu.

    Two months span is too small. Maybe if the span of the bridge is also small you may have a go at it.

    If it’s a small stream and the shores are rock, you can design a single prefabricated foot bridge that can be lowered into position by a crane. Not much foundation may be needed if the base is rocky.

    #-Link-Snipped-# would perhaps have a much better take on this.

    Are you sure? This action cannot be undone.
    Cancel
  • Sairam Madabathula

    MemberNov 23, 2018

    thQ sir

    @#-Link-Snipped-#

    can u suggest me any innovative project topics sir. 

    Are you sure? This action cannot be undone.
    Cancel
  • Ramani Aswath

    MemberNov 23, 2018

    Civil Engineering is not my area.

    Is this just a design only project or is some experiments are expected to be done? There must be some staff supervising b tech level projects. Have they not given any suggestions?

    Probably you can look at a low cost modular temporary housing (single room even) for disaster rehabilitation.

    Please come back on what is expected from the project.