View Feed
group-icon
Coffee Room
Discuss anything here - everything that you wish to discuss with fellow engineers.
12940 Members
Join this group to post and comment.
K GAYATHRI
K GAYATHRI • Jul 22, 2012

Power system operation

if a generator capacity is 250MW and it is providing 200MW according to the load
if the load increases to 210MW suddenly how this power will be generated because it takes some time to generate this 10MW as it requires increase in fuel and generation.within this time which will supply the power to meet this load requirement.
K GAYATHRI
K GAYATHRI • Jul 22, 2012
if a generator capacity is 250MW and it is providing 200MW according to the load
if the load increases to 210MW suddenly how this power will be generated because it takes some time to generate this 10MW as it requires increase in fuel and generation.within this time which will supply the power to meet this load requirement.
K GAYATHRI
K GAYATHRI • Jul 22, 2012
hiii friends
i just want to know the excess power will be supplied by the kinetic energy
of the rotating parts.....
please do reply frinds......
manvarbrijesh
manvarbrijesh • Jul 29, 2012
K GAYATHRI
if a generator capacity is 250MW and it is providing 200MW according to the load
if the load increases to 210MW suddenly how this power will be generated because it takes some time to generate this 10MW as it requires increase in fuel and generation.within this time which will supply the power to meet this load requirement.
our all power system are inter connected so when load is increased then power is drawn from other generation side... so there is no problem at that time......

Share this content on your social channels -