Peak shaving generators

ssembo

ssembo

@ssembo-k8uNVf Oct 25, 2024
Hello, i want to design a peak shaving system. I want to have a circuit that can be able to start/stop and connect/disconnect a generator when there is a peak demand. it must be able to sense the load and then automatically start and connect a generator to the grid to meet the demand.

Need help.

Thanks in advance.

Colin

Replies

Welcome, guest

Join CrazyEngineers to reply, ask questions, and participate in conversations.

CrazyEngineers powered by Jatra Community Platform

  • ssembo

    ssembo

    @ssembo-k8uNVf Jan 24, 2011

    Guys, i need your response. PLease
  • freak16

    freak16

    @freak16-XgiLj6 Jan 25, 2011

    i think it can be done by keeping an eye on frequency.
    If frequency goes down it means load is increasing so we can define a range below which if frequency goes down then a command is triggered to start another unit.
    A computer programme in microcontroller can conrol everything..
    Do redress me..
  • Arp

    Arp

    @arp-8yytsY Jan 26, 2011

    freak is right..