View Feed
group-icon
Coffee Room
Discuss anything here - everything that you wish to discuss with fellow engineers.
12889 Members
Join this group to post and comment.

Long Buildings with Construction joint

How do we add construction joint to long building? In what way a small gap is treated at foundation level? Should we design it as a separate block from the foundation level placing footing base very near to eachother or there is another way to treat such cases?

Share this content on your social channels -