Subodh Kumar Kamal
Subodh Kumar Kamal
Branch Unspecified
03 Mar 2018

Long Buildings with Construction joint

How do we add construction joint to long building? In what way a small gap is treated at foundation level? Should we design it as a separate block from the foundation level placing footing base very near to eachother or there is another way to treat such cases?

Be the first one to reply

Share this content on your social channels -

Only logged in users can reply.