shubhankar
shubhankar • Apr 1, 2011

khaparkheda power plant

On 31st march at 8:29 pm the 500 MW plant at khaparkheda was synchronised and produced 82 MW. this is a boon to the people as it will meet the peak demand during the month of may. it will be the 3rd largest of its kind when it produces to the fullest after chandrapur and dabhol which have an installed capacity of 1340 MW. Great work mahagenco!! 😁
sau
sau • Apr 3, 2011
Congrats MAHAGENCO. I hope the power produced here stays here.
shubhankar
shubhankar • Apr 5, 2011
yes ofcourse. the power will not be sold because maharashtra wil be desperately needing this very power in this summer.
vibhor_one
vibhor_one • Apr 6, 2011
great to hear they are considering peak as important and working out feasible solutions.