Foundation Pile when subjected to PDA Test. Settlement under twice the design load exceeded 38mm.

Question asked by wizz makerr in #Coffee Room on Nov 16, 2018
wizz makerr
wizz makerr · Nov 16, 2018
Rank E2 - BEGINNER

Foundation Pile when subjected to PDA Test

1) Pile is deemed to have failed if total settlement under twice the design load exceeded 38mm.

2) However, the pile still can achieved 2 times working load when subjected to test.

Therefore, if we want to used back the pile and don't consider it as fail. Then usually the pile downgrade for how many percent?

Many Thanks!

Posted in: #Coffee Room