A bespoke filtration solution jointly developed by major oil industry chemical supplier, Champion Technologies, together with 3M’s Oil & Gas business, has significantly reduced the potential risk of blockage in a subsea chemical umbilical system recently installed in the North Sea.

The need to deliver chemicals through a 28km subsea umbilical system – many times typical umbilical length - led to a requirement for production chemicals to be filtered to an exact cleanliness level to minimize the risk of umbilical blockage. “The longer the tieback the more difficult & costly it is to pin-point and remove any source of obstruction,” says Champion Technologies (UK) Ltd., Area Manager, John Reid. “Although there is nothing new about the use of subsea tiebacks, with an increasing percentage of the world’s reserves being in deep water, longer and deeper tiebacks are inevitable and with them comes an increasing risk of umbilical blockage.

Resolving blockages can be an expensive and time consuming process. Most blockages require intervention by divers working from a diving support vessel so the costs can, at best, be hundreds of thousands of pounds and, at worst, depending on deferred production, literally millions of pounds. Proactive measures designed to prevent blockages from occurring in the first place are the key to maintaining effective chemical dosing regimes, addressing customer flow assurance issues and supporting the customer’s production objectives.

To achieve this, production chemicals utilised to treat the system require filtration to an appropriate specification. The filtration process implemented for the operation was collectively developed by 3M working in close cooperation with Champion Technologies and the Operator of the subsea development. An extensive laboratory testing programme identified 3M BetaKlean filters as the most appropriate for the filtration process, providing optimum product filtration.

3M’s Cuno Scientific Application Support Services (SASS) provided the laboratory testing services to support the development of a solution that was fit for purpose and agreeable to all parties. 3M also worked closely with Champion Technologies to modify their existing filtration processes to provide a bespoke solution that was fully compatible with the various types of chemicals their filtration equipment would come into contact with.

The filtration system has now been installed and commissioned; “despite the significant time pressures that can often be involved in a first-fill chemical process, the ease of use of the 3M filtration equipment was also a big help in meeting the delivery schedule” said Reid.

Ian Cairns, Key Account Manager for 3M Cuno Filtration and Oil and Gas UK, suggests that the key to success was collaboration between the 3M Aberdeen-based team and key Champion personnel to enable the development of a comprehensive solution for Champion’s client.

“The increasing use of subsea tiebacks is not just a North Sea phenomenon but an international one, so with the global presence of 3M and Champion Technologies this development has considerable market potential for all.” he suggests.

Replies

You are reading an archived discussion.

Related Posts

Hi

Hi Everybody! I'm yunus reha,ı'm study electrical electronical engeneering in Turkey.
I stumbled upon the Samsung Wave, Samsung's first BADA powered smartphone and I got hooked to it for almost 15 minutes. I searched the Internet for information about BADA and...
A company in Norway, Opera Software (Pyra Labs) the makers of Opera (the world's fastest browser) has had guts to take on the big guys out there in browser market...
Following video shows steps to unlock the iPhone 4 - [video=youtube;_5cvPyVGzgU]https://www.youtube.com/watch?v=_5cvPyVGzgU[/video]
Samsung has announced the BADA developer challenge. The details of the challenge can be obtained here: https://developer.bada.com/challenge/index.do?menu=MC01160200&mtb1=&mtb2= Schedule: - Challenge Registration : May 17~ August 31, 2010 - Simulator Phase...