Excavation near existing foundation.

I need to carry out excavation just 1m away from the footing of an existing Stilt + 3 storied building. The footing of of the building is isolated type and resting on Soft rock at a depth of 1.5 m from existing ground level. The excavation to be carried out to a depth of 4.5 m for installation of Sewage treatment plant,ready made type,manufactured by Sintex Ltd. The water table is at 60m depth.
Please suggest methodology to carry out this excavation keeping the safety of existing building as the prime requirement.
Thanks in advance.

Replies

  • Nachko
    Nachko
    This "1 m away" means that some kind of pile wall could be made in order to shore up the existing building. Other option could be to separate the bordering area into sections, excavate them and work one by one, or in groups, forming "dashed line". This depends on whether the plant installation allows such a manner of progressing.
  • P.K.Mallick
    P.K.Mallick
    Will you please explain how to do the "PILE WALL" !
    Thanks a lot.
  • Mohamed Amir
    Mohamed Amir
    make a secant pile of diameter 400mms known as straws in egypt

    Secant piles are constructed so that there is an intersection of one pile with another. The usual practice is to construct alternative piles along the line of the wall leaving a clear space of a little under the diameter of the required intermediate piles. The exact spacing is determined by the construction tolerances which can be achieved. These initially placed piles do not have to be constructed to the same depth as the intermediate piles which follow, depending on the way in which the wall has been designed and reinforced.
    Concrete is added and before it has fully set the intermediate holes are drilled along a parallel, but slightly offset, line so that the holes cut into the first piles. The intermediate piles are placed through a heavy casing whose cutting edge is toothed and enables the casing to cut into the concrete of the initial piles on either side. Subsequent concreting results in a continuous wall. The concrete chosen will often have a slow rate of setting in order to ease the problem of cutting one pile into another

    Typical applications for secant walls include:
    • Groundwater barriers
    • Retaining walls
    • Foundations

You are reading an archived discussion.

Related Posts

Demolition of old buildings isn't a new thing. Modern explosives allow for a controlled demolition of buildings. But I haven't seen a controlled demolition of a high-rise building or a...
what is the purpose of high pressure and low pressure turbine in rankine cycle with reheat......first we applied the steam on high pressure turbine and after that low pressure turbine...
what is the part of a vapour compression refrigeration system to which if u remove from the system then it will stop working?
Google Play Store more or less has confirmed that android jelly bean will be the name given to android version 4.1. We earlier thought Android 5 will be officially called...
Name:mohammad nazeeruddin *Engineering Trade:mechanical engineering Location:Hyderabad,andhra pradesh,india *Occupation:student Work Experience:--- *Hobbies & Interests: playing cricket or outdoor games,eating food. *Aim in life:to become a mechanical engineer in a reputed automobile...